Week 7 of my 100 days project Scotland

It’s week 7 of the 100 days project, Scotland. You can find out more about the project and my own project plan here >

100 days is 14 weeks and 2 days. So I’ve made it to the halfway point which is amazing. I’m working on getting the first batch of pieces ready for firing now.

 
Pieces 1 to 50 of the 100 days project Scotland Anna Campbell
 
 

Pieces 1 to 50 of my 100 days project. They are arranged in order; week 1 is far left, week 7 is far right

7 weeks is 49 days so I’ve included the first piece from week 8 to complete the 50 piece set.

 
 

This week I have chosen the theme of fabric and yarn. This is a theme with a lot of scope and I’m pleased with how the pieces have worked out.

 
100 days project scotland Anna Campbell
 
Day 43 100 days project Scotland Anna Campbell

Day 43 - lace

Day 46 100 days project Scotland Anna Campbell

Day 46 - sequin santa hat

Day 49 100 days project Scotland Anna Campbell

Day 49 - knotted thread

Day 44 100 days project Scotland Anna Campbell

Day 44 - tangled thread

Day 47 100 days project Scotland Anna Campbell

Day 47 - tea towel

Day 45 100 days project Scotland Anna Campbell

Day 45 - wool

Day 41 100 days project Scotland Anna Campbell

Day 48 - plaited strap

I am sharing my daily progress over on Instagram @annaccampbell with the hashtag #100silvertextures

You can follow all the projects over on https://www.instagram.com/100daysprojectscotland/ and the project website is https://www.100daysscotland.co.uk/

If you’d like to look back on the previous weeks:

The theme for Week 1 was Nature >

The theme for week 2 was In The Kitchen >

The theme for week 3 was Holes >

The theme for week 4 was Paper >

The theme for week 5 was Layered >

The theme for week 6 was Moulds >

 
 
Previous
Previous

Week 8 of my 100 days project Scotland

Next
Next

Free beaded jewellery tutorial - Creative Craft Show Live